After having created a time range for a new timetable (see chapter: Time range of timetable), you can complete several tasks as you have been used to before:
Enter requirements for master data:
In this section you enter framework conditions which need to be considered when a timetable is created (either manually or automatically) (e.g. a teacher’s day off).
Enter requirements for lessons:
Here you define for instance double-period requirements or couplings (e.g. a German lesson has a special tuition teacher).
Scheduling of lessons:
Here you can create a timetable manually according to the entered requirements.